Then came the ridge pole. It had to be 13 1/4 inches thick, and the whole edge of the rafter had to be touching part of the ridge pole, so I made it 15" thick -- one 2x6 and one 2x10 on top of one another. There was no way we could lift the whole thing at once. I thought we would need to build a pole in the middle of the loft to support the weight until we got some rafters up, but Dan suggested just scabbing the boards together, starting with the 2x6. Of course, he had to leave long before we got to putting the 2x10 part up. It wasn't until he realized what we were doing that he mentioned he had to leave soon. Convenient! That left me, Michele, and Dad. All of us were pretty apprehensive, but I was determined to get it up while we still had Dad around.
Here is how we did it: I got up on the front wall (again, the one with no floor underneath) and held on. Michele was on the loft. Dad used the ladder to help me lift my side onto the rafter and hold it there until the other side was ready to go. He had suggested nailing a 2x4 scrap on top of the rafter to allow the ridge pole to rest there. I dismissed the idea, but it didn't take me long to realize that was a mistake. It was all I could do to hold it in place, stretched as far I could go above my head. Meanwhile, Dad climbed up to the loft, and he and Michele struggled to get their end up, then they slid it up the rafter and Dad twisted the whole board so that it fell into the notch between both rafters on either end. I couldn't have held it much longer. Michele told me later that she had congratulated Dad on being able to get the board in place and he responded that it was either that or lose his son. I'm glad he has his priorities in place! It was one of those situations that very easily could have turned out poorly. We were all exhausted and relieved when it was over, and I was on a real high for hours afterwards!