
2. When measuring a header, measure from the regular studs, not from the inside of the jack studs. Otherwise, you will be 3.5 inches shy.
3. Draw out the wall frame before building (Peter's suggestion).
4. When your mother offers you a notepad for jotting down measurements, lists, etc, just take it. Resistance is futile.
5. Don't be too attached to the plans you have for the day. Not that I haven't learned that lesson many times before, but I keep learning it.
6. Lock up your tools. I discovered that about $100 worth of tools was missing from the worksite. A real bummer. I bought a metal jobsite storage box that is now chained to a tree. It feels so gross to have to worry about that on my land.
7. Put the baseplate gasket and termite shield down BEFORE setting the framed wall in place!
No comments:
Post a Comment